ADVERTISEMENT
KPTCL restores power connection at pumping stations in BengaluruPower connection was cut off last night owing to a technical problem due to heavy rain and lightning.
DHNS
Last Updated IST
<div class="paragraphs"><p>Image for representation.</p></div>

Image for representation.

Credit: iStock Photo

Bengaluru: The Karnataka Power Transmission Corporation Ltd (KPTCL) on Thursday restored the power connection to the Harohalli and TK Halli pumping stations from where Cauvery water is supplied to Bengaluru.

ADVERTISEMENT

Power connection was cut off last night owing to a technical problem due to heavy rain and lightning. 

"There was disruption in the power connection around 11 pm last night. As a result, water pumping was stopped for about 10 hours. Even though the water pumping process has been restored, there may be some disruption in water supply to some areas of the city,” BWSSB Chairman Ram Prasath Manohar said. 

ADVERTISEMENT
(Published 04 October 2024, 05:35 IST)