Builder resumes construction of illegal structure in Bengaluru a day after BBMP’s demolition
The builder not only added an extra floor that deviated from the sanctioned plan, but also violated setback regulations. However, the day after the demolition, the builder began reconstructing part of the razed structure and continued construction.