<p>The railways on Monday threw open an additional escalator at platform numbers 2 and 3 of the KSR Station.</p>.<p>Monabi, a 23-year-old construction worker, and her two-year-old son Amir Khan inaugurated the escalator.</p>.<p>The down–direction escalator was built in 175 days from the date of awarding the contract. Monabi is one of the labourers who worked on the construction site.</p>.<p>Divisional Railway Manager, Bengaluru, Ashok Kumar Verma, was present during the event.</p>.<p>This is the second time an escalator was being inaugurated by a labourer. Earlier, the escalator at platform no 4 was inaugurated on November 9 by 32-year-old Chandbi and her daughter Kumri Begumma (10).</p>
<p>The railways on Monday threw open an additional escalator at platform numbers 2 and 3 of the KSR Station.</p>.<p>Monabi, a 23-year-old construction worker, and her two-year-old son Amir Khan inaugurated the escalator.</p>.<p>The down–direction escalator was built in 175 days from the date of awarding the contract. Monabi is one of the labourers who worked on the construction site.</p>.<p>Divisional Railway Manager, Bengaluru, Ashok Kumar Verma, was present during the event.</p>.<p>This is the second time an escalator was being inaugurated by a labourer. Earlier, the escalator at platform no 4 was inaugurated on November 9 by 32-year-old Chandbi and her daughter Kumri Begumma (10).</p>