×
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT

JSW Energy subsidiary signs 300 MW power pact with Bescom

The 300 MW solar project will be developed at the Pavagada Solar Park and the PPA has been finalised for a power supply until FY 2044 at a tariff of Rs 2.89 per kilowatt-hour (kWh). The project is slated for commissioning within the next 18 months.
Last Updated : 06 September 2024, 22:48 IST

Follow Us :

Comments
ADVERTISEMENT
Published 06 September 2024, 22:48 IST

Follow us on :

Follow Us