After Atal Setu, now cracks on Samruddhi Corridor, claims Nana Patole; says Modi's guarantees 'unreliable'
'There was also major corruption in the construction of the Mumbai-Nagpur Samruddhi Mahamarg, which was built at a cost of Rs 55,000 crore. Due to corruption, cracks have appeared on this highway within a year,' said Patole.