CSMIA to conduct annual comprehensive post-monsoon runway maintenance
This scheduled temporary closure is a part of CSMIA’s annual post-monsoon preventive maintenance plan. A Notice to Airmen (NOTAM) has also been duly issued in this regard six months in advance.