<p>Bengaluru: In a significant development, K-RIDE has set the ball rolling for the construction of 18 stations on the Kanaka Line of the Bengaluru Suburban Railway Project (BSRP). </p><p>Kanaka Line, also Corridor 4, will connect Heelalige in the far south to Rajanukunte in the far north over 46.88 km. </p><p>On December 31, 2023, K-RIDE awarded L&T Limited the Kanaka Line's civil contract related to the design and construction of the viaduct. The contractor has commenced pre-construction activities. </p>.K-RIDE to have technical expert as full-time MD soon: V Somanna.<p>K-RIDE, the implementing agency for the BSRP, has now called tenders for the design and construction of the Kanaka Line's 18 stations in two packages for Rs 1,032.11 crore (excluding GST). </p><p>Package C4A consists of one elevated station and eight at-grade stations. These are Heelalige, Singena Agrahara, Huskur, Ambedkar Nagar, Carmelaram, Bellandur, Marathahalli, Doddanekkundi and Kaggadasapura. The project cost is Rs 504.11 crore (excluding GST) with a 24-month deadline. </p><p>Package C4B also consists of one elevated station and eight at-grade stations. These are Channasandra, Horamavu, Hennur, Thanisandra, RK Hegde Nagar, Jakkur, Yelahanka, Muddanahalli and Rajankunte. </p>.Namma Metro daily ridership nears a record 7.5 lakh.<p>Civil, structural, entry/exit structure, steel FOB, roof structures, PEB works, architectural finishes and other associated works are part of both tenders. The project cost is Rs 528 crore (excluding GST) with a 24-month deadline. </p><p>Earlier, K-RIDE called tenders for the station work under the Mallige Line, also Corridor 2, which will connect Benniganahalli with Chikkabanavar over 25.57 km. </p><p>The stations are Benniganahalli, Kasturi Nagar, Seva Nagar, Banaswadi, Nagawara, Kanaka Nagar, Hebbal, Mathikere, Yeshwantpur, Shettyhalli, Myadarahalli and Chikkabanavar. </p><p>The 149-km BSRP's deadline is December 2027. </p>
<p>Bengaluru: In a significant development, K-RIDE has set the ball rolling for the construction of 18 stations on the Kanaka Line of the Bengaluru Suburban Railway Project (BSRP). </p><p>Kanaka Line, also Corridor 4, will connect Heelalige in the far south to Rajanukunte in the far north over 46.88 km. </p><p>On December 31, 2023, K-RIDE awarded L&T Limited the Kanaka Line's civil contract related to the design and construction of the viaduct. The contractor has commenced pre-construction activities. </p>.K-RIDE to have technical expert as full-time MD soon: V Somanna.<p>K-RIDE, the implementing agency for the BSRP, has now called tenders for the design and construction of the Kanaka Line's 18 stations in two packages for Rs 1,032.11 crore (excluding GST). </p><p>Package C4A consists of one elevated station and eight at-grade stations. These are Heelalige, Singena Agrahara, Huskur, Ambedkar Nagar, Carmelaram, Bellandur, Marathahalli, Doddanekkundi and Kaggadasapura. The project cost is Rs 504.11 crore (excluding GST) with a 24-month deadline. </p><p>Package C4B also consists of one elevated station and eight at-grade stations. These are Channasandra, Horamavu, Hennur, Thanisandra, RK Hegde Nagar, Jakkur, Yelahanka, Muddanahalli and Rajankunte. </p>.Namma Metro daily ridership nears a record 7.5 lakh.<p>Civil, structural, entry/exit structure, steel FOB, roof structures, PEB works, architectural finishes and other associated works are part of both tenders. The project cost is Rs 528 crore (excluding GST) with a 24-month deadline. </p><p>Earlier, K-RIDE called tenders for the station work under the Mallige Line, also Corridor 2, which will connect Benniganahalli with Chikkabanavar over 25.57 km. </p><p>The stations are Benniganahalli, Kasturi Nagar, Seva Nagar, Banaswadi, Nagawara, Kanaka Nagar, Hebbal, Mathikere, Yeshwantpur, Shettyhalli, Myadarahalli and Chikkabanavar. </p><p>The 149-km BSRP's deadline is December 2027. </p>