Newsletters
ePaper
Sign in
Home
India
Assembly Polls 2024
Karnataka
Opinion
World
Business
Sports
Entertainment
Video
News Shots
Explainers
Bengaluru
Science
Trending
Photos
Brandspot
DH Specials
Home
News Shots
Trending
Menu
×
ADVERTISEMENT
ADVERTISEMENT
Sampaje Ghat
No permanent restoration works taken up at Sampaje Ghat
Heaps of mud which seem to fall on the road any moment and the unattended huge wooden logs which were washed along with the flash floods on NH 275 of Sampaje Ghat (from Jodupala to Madikeri) are grim reminders of the nightmarish flash floods and landslides that shook the region last year.
14 May 2019, 20:06 IST
No permanent restoration works taken up at Sampaje Ghat
14 May 2019, 20:06 IST
Shiradi, Sampaje Ghat closure hits KSRTC bus services
The closure of Shiradi and Sampaje Ghats, which connect Mangaluru with Bengaluru and Mysuru, has hit KSRTC bus services.
15 December 2018, 14:12 IST
Shiradi, Sampaje Ghat closure hits KSRTC bus services
15 December 2018, 14:12 IST
Restoration work on Sampaje Ghat on war footing
With the life in Madenadu, on the border of DK-Kodagu district limping back to normalcy after devastating flood and landslides, the work on Sampaje Ghat road is taken up on war foot basis.
25 September 2018, 21:06 IST
Restoration work on Sampaje Ghat on war footing
25 September 2018, 21:06 IST
Alternative route: KSRTC incurs Rs 3-cr loss
At the sixth and final treacherous curve on the Kalasa-Karnataka Road, the driver stopped. The conductor, knowing exactly what to do, alighted from the vehicle.
19 September 2018, 17:51 IST
Alternative route: KSRTC incurs Rs 3-cr loss
19 September 2018, 17:51 IST
Five alternative roads to reach Madikeri identified
With the closure of Sampaje Ghat (Mangaluru-Madikeri) highway causing inconvenience to people, the Sampaje Gram Panchayat in Kodagu district has submitted a proposal to the district administration to develop five alternative roads.
05 September 2018, 20:27 IST
Five alternative roads to reach Madikeri identified
05 September 2018, 20:27 IST
Mani-Mysuru highway to be opened in 20 days
As rain recedes, the life in Kodagu is slowly limping back to normalcy, and the work on Mani-Mysuru highway is in progress. If everything goes well, the stretch is likely to be opened for light vehicles within 20 days, said Kodagu DC P I Srividya.
02 September 2018, 18:26 IST
Mani-Mysuru highway to be opened in 20 days
02 September 2018, 18:26 IST
Light vehicles to be allowed on Shiradi, Sampaje Ghats
Public Works Department Minister H D Revanna on Saturday said the Shiradi Ghat stretch on Bengaluru-Mangaluru National Highway and the Jodupala stretch on Mangaluru-Madikeri Road (Sampaje Ghat) will be opened for light vehicles in ten days.
01 September 2018, 20:14 IST
Light vehicles to be allowed on Shiradi, Sampaje Ghats
01 September 2018, 20:14 IST
KSRTC runs mini buses from Sullia-Karike-Madikeri
With the closure of Sampaje Ghat -- road connectivity between Madikeri and Sullia has remained a Herculean task.
23 August 2018, 20:38 IST
KSRTC runs mini buses from Sullia-Karike-Madikeri
23 August 2018, 20:38 IST
Major damages may delay opening of Sampaje Ghat
The landslides at mutiple locations and severe damage to culverts and roads on Sampaje Ghat (NH 275) from Jodupala to Madikeri, in Kodagu district...
22 August 2018, 18:40 IST
Major damages may delay opening of Sampaje Ghat
22 August 2018, 18:40 IST
Landslides hit Shiradi, Sampaje Ghats; roads blocked
Mangaluru-Bengaluru traffic being diverted to Charmadi Ghat
15 August 2018, 07:29 IST
Landslides hit Shiradi, Sampaje Ghats; roads blocked
15 August 2018, 07:29 IST